Industry news
  
Manual crane lift

\

Our manual crane lift has got ISO9001 certificate and CE certificate. Except for the international quality standards, we implement our much more rigid company standardized program except for the international quality standards in different production stages and test stages to ensure each part of the equipments is 100% reliable.


Crane maintenance manual can be used any reinforced concrete ground that is 15cm thick. It won't increase the pressure on the roof of the construction. The track can be buried under the ground, so that the surface seems like in the same level with the ground. It will not affect other working cars. Using preengineered modularity design, it can expand with the work unit expanding.

1. easy installation, moving and expanding;
2. closed design VS traditional crane, 1/3 effort saving.
3. Truss model steel rail design can span longer, more flexible installation layout.

 

Inquiry

info@hengsheng-crane.com  0086-372-3719988
Name:
Tel:
* E-mail:
*Inquiry:
Any question you may have.
Don't hesitate to contact us.
Your inquiry will be replied in 24h.
Copyright © 2014 Hengsheng Crane Co., Ltd. All rights reserved. sitemap         info@hengsheng-crane.com   0086-372-3719988